01

TUBE AND JOINT SCAFFOLDING

The tube and joint scaffolding system is the precursor of all steel scaffolding and is extremely flexible.The different types of orthogonal, swivel, terminal and pull joints allow the construction of any geometry.

The Ministerial approval for Pilosio’s Tube and Joint scaffolding requires the use of diagrams both for maintenance and construction work.

T & G scaffolding, suitable for carrying out all geometries.T & G scaffolding, suitable for carrying out all geometries.

STRENGTHS

• the maximum capacity is 150 kg/m2 on the most loaded floor, for maintenance scaffolding

• the maximum capacity is 300 Kg/m2 on the most loaded floor, for construction scaffolding

• great versatility it is suitable for complex and nonlinear works

• it is used for restoration, maintenance and construction, from residential to industrial applications and as a support structure

• simple and versatile to use

• the Ministerial authorizations allow using the tube and joint system for the construction of anchoring points, connections and particular structures with all types of prefabricated and multidirectional scaffoldings.

Tube and joint double coupler Pilosio.Tube and joint double coupler Pilosio.

CHARACTERISTICS

• pipes with ø 48.3 mm and 3.2 mm thick with standard length from 60 cm to 6 m

• painting or hot galvanization

Tube and joint scaffolding steel Pilosio.Tube and joint scaffolding steel Pilosio.